Monday, 7 September 2020

Cagiva Mito 125 regulator and charging system testing .


Need a multimeter try here 

need a new regulator rectifier try here 

need generator alternator try here 



First ill show a quick test on diodes inside you regulator rectifier .

You are just checking current flow through the regulators diodes in forward and reverse bias.











connect + lead of multimeter to further left connector pin 
and common lead to 2nd pin from left you should get a voltage reading of around 0.6 
here i get 0.52 which is ok


then test 3rd pin from left it should give same reading 




now connect common lead of multimeter to left pin and + lead 
of meter to the second pin from left you should get OL telling you no 
current is flowing as it should be.


Now test with + lead of meter to third pin from left and same OL
no current flow 



 


now connect common lead to the further right hand side 
and + lead to second from left you should see 0.6v i get 0.52 which is ok 


move red + lead to thurd pin from left and should get 0.6v again i get 0.506 which is ok


Switch + lead to further right pin and touch blue to second and 
third pins and you should get 0L no current flowing 



That is a quick test the rest of images that follow show tests from Cagiva Mito workshop manual 












Need a multimeter try here 

need a new regulator rectifier try here 

need generator alternator try here 










No comments:

Post a comment

No spam